What the standard asksDocumented procedures that set out the scope and the steps for shutting down, isolating, blocking and securing equipment, for placing, removing and transferring devices, and for testing that isolation works.
What Smart LOTO does- Every isolation point mapped to the equipment it isolates, with its energy type.
- Each permit lists the points to isolate, from your permit system or raised in the app.
- The app runs the steps in order: area owner, permit issuer, lockout, verification. A step that isn't safe yet is refused.