Phase 1 · Permit
01 Permit arrives
The permit lands with its points.
The work order is raised in your permit-to-work system and arrives in Smart LOTO within seconds: the equipment, every isolation point it needs, and the people named on it. No permit system? Raise it in the app.
- The area owner verifies the job and the area.
- The permit issuer approves the isolation plan before anyone touches a switch.
Permit Holder raisesArea Owner verifiesPermit Issuer approves
Phase 2 · Isolate
02 At the point
Scan first. Then lock.
The isolator walks to the first point on the list. Every isolation point carries its own QR tag, and the app will not accept a lock until that tag has been scanned.
Isolator on the floor
03 QR verification
Wrong point? No lock.
The scan is checked against the permit on the spot. The right feeder, the right valve, the right breaker, or the app says so in plain words.
Refused by the systemA tag that isn't on this permit can't take a lock. Nobody isolates the neighbouring drive by mistake.
04 Lock on
The lock reports itself.
A BLE smart lock goes on the isolating device. The moment its shackle closes, the lock tells the phone, and the point turns from open to locked with the time, the lock and the person recorded.
- QR-only mode works with your existing padlocks.
- Hybrid mode mixes both across a plant.
05 Every point
Point by point, every energy.
MCC feeders, racked-out HT breakers, air, hydraulics, steam and process lines, blinds and mechanical stops. Progress counts up until the last point on the permit is locked.
ElectricalPneumaticHydraulicProcessMechanical
06 Prove it
Zero energy, on the record.
Try-out at the local start, gauges bled to zero, and an evidence photo of the locked point. Point, lock, status and time are burned into the photo, and it can never be edited or deleted.
Isolator provesPermit Holder verifies isolation
Phase 3 · Work
07 Assign the crew
Nobody is sent in before it's safe.
Workers can only be assigned once isolation is verified. The permit holder picks the crew, staff and contractors alike, and each one is notified.
Refused by the systemAssigning workers is locked while any point on the permit is still open.
08 Face ID in
A face, not a signature.
Each worker checks in with Face ID. A randomised head-turn proves a live person is in front of the camera, not a photo. Contractors are enrolled on site on the permit holder's phone, with no account or password.
- Check-in places a personal lock on the job for that worker.
09 Work
A live crew, on a live screen.
Everyone on the job, their personal locks and every isolated point are visible to the permit holder, the control room and the safety manager. Any worker can scan a point and ask “Am I safe?”.
Phase 4 · Release
10 Check-out + verification
Out by name, last one counts.
Each worker checks out with Face ID, which lifts their personal lock. De-isolation stays blocked, by name, until the last one is out. Then the permit holder verifies the work is done.
Refused by the systemNo de-isolation request while anyone is still checked in. The server enforces it, not just the phone.
11 Permit Issuer approval
The permit issuer says when.
From the control room or the desk, the permit issuer reviews the permit, sees that the crew is out and the work verified, and approves de-isolation. Nothing comes off before that.
Permit Issuer approves
12 Locks off
Locks off, in the right order.
The isolator scans each lock to remove it, following the order the permit sets. A lock shared with another permit stays on until the last permit holding it is complete.
13 Proof of release
A photo for the way back, too.
De-isolation leaves the same stamped, write-once evidence as isolation, so the record shows exactly what came off, when, and who took it off.
Phase 5 · Close
14 Close + report
Closed, reported, back in your permit system.
The permit closes and your permit system is updated. A report aligned to OSHA 29 CFR 1910.147, with every scan, lock, face check and photo, is one tap away as a PDF.