How it works

Permit to power-on. Every step proven.

One permit, followed from the moment it lands from your permit-to-work system to the moment the machine runs again. At every step the app asks for evidence, and refuses to move on without it.

Permit recordDEMO-GWP-20417
  1. Received from the permit systemIN
  2. RM-MCC-07 locked, shackle reportedLOCK
  3. Zero energy proven, 4 photos✓
  4. S. Okafor in by Face IDFACE
  5. Last worker outFACE
  6. Permit Issuer approved de-isolationAPPR
  7. Complete, permit system updatedOUT
Phase 1 · Permit
01 Permit arrives

The permit lands with its points.

The work order is raised in your permit-to-work system and arrives in Smart LOTO within seconds: the equipment, every isolation point it needs, and the people named on it. No permit system? Raise it in the app.

  • The area owner verifies the job and the area.
  • The permit issuer approves the isolation plan before anyone touches a switch.
Permit Holder raisesArea Owner verifiesPermit Issuer approves
Phase 2 · Isolate
02 At the point

Scan first. Then lock.

The isolator walks to the first point on the list. Every isolation point carries its own QR tag, and the app will not accept a lock until that tag has been scanned.

Isolator on the floor
03 QR verification

Wrong point? No lock.

The scan is checked against the permit on the spot. The right feeder, the right valve, the right breaker, or the app says so in plain words.

Refused by the systemA tag that isn't on this permit can't take a lock. Nobody isolates the neighbouring drive by mistake.
04 Lock on

The lock reports itself.

A BLE smart lock goes on the isolating device. The moment its shackle closes, the lock tells the phone, and the point turns from open to locked with the time, the lock and the person recorded.

  • QR-only mode works with your existing padlocks.
  • Hybrid mode mixes both across a plant.
05 Every point

Point by point, every energy.

MCC feeders, racked-out HT breakers, air, hydraulics, steam and process lines, blinds and mechanical stops. Progress counts up until the last point on the permit is locked.

ElectricalPneumaticHydraulicProcessMechanical
06 Prove it

Zero energy, on the record.

Try-out at the local start, gauges bled to zero, and an evidence photo of the locked point. Point, lock, status and time are burned into the photo, and it can never be edited or deleted.

Isolator provesPermit Holder verifies isolation
Phase 3 · Work
07 Assign the crew

Nobody is sent in before it's safe.

Workers can only be assigned once isolation is verified. The permit holder picks the crew, staff and contractors alike, and each one is notified.

Refused by the systemAssigning workers is locked while any point on the permit is still open.
08 Face ID in

A face, not a signature.

Each worker checks in with Face ID. A randomised head-turn proves a live person is in front of the camera, not a photo. Contractors are enrolled on site on the permit holder's phone, with no account or password.

  • Check-in places a personal lock on the job for that worker.
09 Work

A live crew, on a live screen.

Everyone on the job, their personal locks and every isolated point are visible to the permit holder, the control room and the safety manager. Any worker can scan a point and ask “Am I safe?”.

Phase 4 · Release
10 Check-out + verification

Out by name, last one counts.

Each worker checks out with Face ID, which lifts their personal lock. De-isolation stays blocked, by name, until the last one is out. Then the permit holder verifies the work is done.

Refused by the systemNo de-isolation request while anyone is still checked in. The server enforces it, not just the phone.
11 Permit Issuer approval

The permit issuer says when.

From the control room or the desk, the permit issuer reviews the permit, sees that the crew is out and the work verified, and approves de-isolation. Nothing comes off before that.

Permit Issuer approves
12 Locks off

Locks off, in the right order.

The isolator scans each lock to remove it, following the order the permit sets. A lock shared with another permit stays on until the last permit holding it is complete.

13 Proof of release

A photo for the way back, too.

De-isolation leaves the same stamped, write-once evidence as isolation, so the record shows exactly what came off, when, and who took it off.

Phase 5 · Close
14 Close + report

Closed, reported, back in your permit system.

The permit closes and your permit system is updated. A report aligned to OSHA 29 CFR 1910.147, with every scan, lock, face check and photo, is one tap away as a PDF.

Who does what

Five roles. One live record.

Each person sees only the step that is theirs, on the device that suits where they stand. The app hands the permit from one to the next, and nobody can act out of turn.

01 · RAISES + VERIFIES

Permit Holder

Who
Production or shift in-charge.
Where
On the floor and at the section office, on a phone or tablet.
Does
Raises or receives the permit, assigns workers once isolation is verified, and verifies the work is done.
02 · VERIFIES

Area Owner

Who
Area owner or plant safety.
Where
Across the area they are answerable for.
Does
Checks the job, the area and its hazards before the permit goes up for approval.
03 · APPROVES

Permit Issuer

Who
Senior engineer with authority over the equipment.
Where
Usually at a desk or in the control room, on the web console.
Does
Approves the isolation plan up front, and approves de-isolation at the end.
04 · LOCKS + RELEASES

Isolator

Who
Qualified electrician or operator.
Where
At the MCC, the valve, the breaker, with a phone.
Does
Scans each point, isolates, fits the lock, proves zero energy and takes the photo. Removes locks in order at the end.
05 · WORKS

Worker

Who
Maintenance staff and contractors.
Where
Inside the machine. No login needed; their face is their key.
Does
Checks in and out by Face ID, holding a personal lock on the job the whole time.

Role names follow your plant: “shift in-charge”, “area owner”, “permit issuer”. Each organisation sets its own.

The workflow, as the app runs it

Twelve stages. None skippable.

These are the permit states you see in the app and in your permit system. A permit only moves forward when the person who owns the current stage completes it with the evidence it asks for.

  1. DraftPermit Holder
  2. Pending area ownerArea Owner
  3. Pending permit issuerPermit Issuer
  4. Lockout in progressIsolator
  5. Isolation verificationPermit Holder
  6. Assign workersPermit Holder
  7. Work in progressWorkers
  8. Work verificationPermit Holder
  9. Deiso approvalPermit Issuer
  10. Tagout removalIsolator
  11. Close permitPermit Holder
  12. CompletePermit system updated
Permit HolderArea OwnerPermit IssuerIsolatorWorkers
Dead zones

No signal in the mill? Still locked.

Isolation points live where networks don't: deep in a raw mill, behind a steel switch-room door, three floors down a preheater tower. Smart LOTO is built for that.

01The lock talks to the phone, not the network. Locking and unlocking run over Bluetooth between the smart lock and the isolator's phone, right at the point.
02Made for patchy plant networks. The app is designed around weak and dropping signal, the normal state of a plant floor.
03Interlocks still hold. The rules that stop an unsafe step are enforced on the server, so the record everyone sees stays the single source of truth.
NO-SIGNAL ZONE · MILL FLOOR LOCKED ✓ BLUETOOTH SMART LOCK SERVER
Walk it with us

Bring one permit. We'll run it end to end.

Send a real permit and its isolation points. We'll set it up and walk your permit holders, permit issuers and isolators through every step on real hardware.