The platform

Every lock. Every person. One platform.

QR verification, smart locks and Face ID at the point. Group lockout, shared isolations and machine trials for the jobs that break paper systems. A live view of the plant, an audit trail nobody can edit, and two-way links to the systems you already run.

01 · Core

Proof at the point, every time.

✓ RM-MCC-07 · on permit ✕ RM-MCC-08 · not on permit Checked in 0.4 s
QR verification

Wrong point? No lock.

Every isolation point carries a QR tag. The isolator scans it before a lock goes on, and the app checks it against the permit on the spot.

SHACKLECLOSED
BATTERY92%
REPORTED08:54:12
BLE smart lock

A lock that reports its own shackle.

When the shackle closes, the lock tells the phone over Bluetooth. Locked means locked, recorded with the time, the lock and the person, not ticked on a form.

QR-onlyYour existing padlocks, QR-verified
HybridSmart locks where it matters most
Smart lockEvery shackle reported
Lock modes

Start with the locks you own.

Run QR-only with traditional padlocks, go all smart lock, or mix both across a plant.

← TURN LEFT LIVE ✓
Face ID + liveness

A face, not a signature.

Workers check in and out by face. A randomised head-turn defeats photos and replays.

RM-MCC-07 · ISOLATED
RM🔒SO🔒AN🔒VS
3 personal locks on this job
Personal virtual locks

Everyone holds their own lock.

Checking in by Face ID places a personal lock for that worker. Nothing is released while one remains.

02 · Built for big plants

The jobs that break paper.

Shutdowns with hundreds of contractors, two crews on one header, a trial run in the middle of a job. This is where lockout usually goes wrong, and where the system has to hold the line.

GROUP LOTO BOXDEMO-GWP-20417
RMVSSOJDPTANMKHSBR
DE-ISOLATION BLOCKED2 still on the job: S. Okafor, A. Novak
Digital group LOTO box

Blocked, by name, until the last one is out.

Every worker's personal lock sits in one digital box. The permit can't move to de-isolation while a single lamp is lit, and everyone can see whose it is.

SIMOPS shared isolations

One lock, many permits.

Two jobs on one valve share one physical lock. It comes off only when the last permit holding it completes.

Everyone outPermit Issuer approvesTest points releasedTrial runRe-isolated TRIAL
RUN
Machine trials (AVI)

Test it, then lock it back.

All workers check out, the permit issuer approves, only the points the trial needs are released, and re-isolation is enforced before work resumes.

TOPO₂ 20.9 · LEL 0
MIDO₂ 20.9 · LEL 0
BTMO₂ 20.8 · H₂S 0
2INSIDE
Confined space

Know who's inside.

Blinds, three-level gas tests, a standby attendant and a live head count.

SCANNED · RM-MCC-07 SAFE Locked · 2 permits · 3 people on the job
“Am I safe?”

One scan, a straight answer.

Any worker scans a point and sees whether it's locked, by whom, and for which permit.

REQUESTPermit HolderStates the reason
→
AUTHORISESenior technical headApproves or refuses
→
LOGGEDAudit trailWho, why, when
Emergency-unlock governance

Emergencies, with a paper trail.

An emergency unlock needs a request with a reason and a senior technical head's authorisation. Every one is on the record.

S. OkaforFitter · contractor firm
FACE ENROLLED ✓NO LOGIN
Contractor enrolment

On site in two minutes.

Contractors are enrolled on the permit holder's device with a face scan. No account, no password, nothing to forget at the gate.

03 · Control + insight

The whole plant, on one screen.

For the control room, the safety manager and the plant head: what is locked right now, who is inside, how long permits take, and a record that answers any question later.

Demo Plant · liveUPDATED NOW
Active permits14
People on jobs63
QR compliance98%
Median cycle3h 40m
Near-misses2
PERMITS CLOSED · LAST 14 DAYS
Kiln 1 · burnerWORK
Raw mill · driveLOCKOUT
Cooler · IK fanWORK
Packing · belt 3DEISO
Live plant dashboard

Every lock, every person, right now.

Active permits, people on site, locked points and pending approvals, live for the control room.

  1. Permit completePermit system updated
  2. Lock L-0142 removedRM-MCC-07 · photo
  3. De-isolation approvedpermit issuer@demo
  4. Face ID check-outS. Okafor · liveness ✓
  5. Face ID check-inS. Okafor · liveness ✓
  6. Shackle closedL-0142 · reported by lock
  7. QR verifiedRM-MCC-07
Audit trail

Written once.

Every entry is timestamped as it happens and can't be edited or deleted. Export it any time.

LOTO REPORT29 CFR 1910.147
PDF
OSHA report

One PDF per permit.

Aligned to OSHA 29 CFR 1910.147: energy sources, locks, try-out, personnel and release, in order.

ISO · RM-MCC-07
08:54
ISO · RM-AIR-V3
09:03
DEISO · RM-MCC-07
14:41
Evidence photos

Stamped at the shutter.

Point, lock, status and time burned into every isolation and de-isolation photo. Immutable.

Analytics

Where the hours go.

QR compliance, cycle times by stage, approvals that wait, and near-misses by area and shift.

04 · Integrations

Fits the systems you already run.

Smart LOTO doesn't ask you to replace your permit-to-work system. It plugs into it, and into the rest of your stack.

YOUR PERMIT SYSTEMPermit-to-workWork orders, approvals
Permits + isolation points in
Isolation events back
SMART LOTOIsolation of recordScans, locks, faces, photos
Equipment, users, events
Asset + org master data
SAP · ERP · CUSTOMOpen APIMaintenance, HR, BI

Multi-org, multi-plant

One platform for a whole group. Each organisation and plant is walled off from the others, with its own users, equipment and permits, and a group view where you want one.

Your role names

Permit HolderShift in-charge
Area OwnerArea owner
Permit IssuerPermit issuer

Each organisation names the roles the way its people already talk.

Your workflow

Stages, approvals and evidence requirements are configured per organisation, so the app runs your isolation procedure, not a generic one.

05 · Apps

On the floor, at the desk.

Android

The field app for isolators, permit holders and workers. Built for gloves, glare and Bluetooth locks.

iOS

The same field app on iPhone, with the same Face ID check-in, QR scanning and smart-lock control.

Web console

For permit issuers, control rooms and admins: approvals, the live dashboard, analytics, reports, users and equipment.

See the platform live

Your hardest job, on our platform.

Pick the shutdown, the shared header or the trial run that worries you most. We'll set it up in Smart LOTO and walk your team through it.