Wrong point? No lock.
Every isolation point carries a QR tag. The isolator scans it before a lock goes on, and the app checks it against the permit on the spot.
QR verification, smart locks and Face ID at the point. Group lockout, shared isolations and machine trials for the jobs that break paper systems. A live view of the plant, an audit trail nobody can edit, and two-way links to the systems you already run.
Every isolation point carries a QR tag. The isolator scans it before a lock goes on, and the app checks it against the permit on the spot.
When the shackle closes, the lock tells the phone over Bluetooth. Locked means locked, recorded with the time, the lock and the person, not ticked on a form.
Run QR-only with traditional padlocks, go all smart lock, or mix both across a plant.
Workers check in and out by face. A randomised head-turn defeats photos and replays.
Checking in by Face ID places a personal lock for that worker. Nothing is released while one remains.
Shutdowns with hundreds of contractors, two crews on one header, a trial run in the middle of a job. This is where lockout usually goes wrong, and where the system has to hold the line.
Every worker's personal lock sits in one digital box. The permit can't move to de-isolation while a single lamp is lit, and everyone can see whose it is.
Two jobs on one valve share one physical lock. It comes off only when the last permit holding it completes.
All workers check out, the permit issuer approves, only the points the trial needs are released, and re-isolation is enforced before work resumes.
Blinds, three-level gas tests, a standby attendant and a live head count.
Any worker scans a point and sees whether it's locked, by whom, and for which permit.
An emergency unlock needs a request with a reason and a senior technical head's authorisation. Every one is on the record.
Contractors are enrolled on the permit holder's device with a face scan. No account, no password, nothing to forget at the gate.
For the control room, the safety manager and the plant head: what is locked right now, who is inside, how long permits take, and a record that answers any question later.
Active permits, people on site, locked points and pending approvals, live for the control room.
Every entry is timestamped as it happens and can't be edited or deleted. Export it any time.
Aligned to OSHA 29 CFR 1910.147: energy sources, locks, try-out, personnel and release, in order.
Point, lock, status and time burned into every isolation and de-isolation photo. Immutable.
QR compliance, cycle times by stage, approvals that wait, and near-misses by area and shift.
Smart LOTO doesn't ask you to replace your permit-to-work system. It plugs into it, and into the rest of your stack.
One platform for a whole group. Each organisation and plant is walled off from the others, with its own users, equipment and permits, and a group view where you want one.
Each organisation names the roles the way its people already talk.
Stages, approvals and evidence requirements are configured per organisation, so the app runs your isolation procedure, not a generic one.
The field app for isolators, permit holders and workers. Built for gloves, glare and Bluetooth locks.
The same field app on iPhone, with the same Face ID check-in, QR scanning and smart-lock control.
For permit issuers, control rooms and admins: approvals, the live dashboard, analytics, reports, users and equipment.
Pick the shutdown, the shared header or the trial run that worries you most. We'll set it up in Smart LOTO and walk your team through it.