Digital lockout / tagout for heavy industry

Lockout that proves itself.

Every isolation point QR-verified. Every smart lock reporting its own shackle. Every worker checked in by Face ID. Smart LOTO turns the most dangerous minutes in your plant into a record nobody has to take on trust.

The film · 2 minutes

One lockout, start to finish.

Power off, locks on, people in, people out, power back on. Each feature has its own short film, step by step, on the film page.

The problem

A paper tag says a lock is on. It can't prove it.

Lockout/tagout is where production pressure meets stored energy. On paper, nobody can see whether the right point was isolated, whether the lock is still on, or who is still inside the machine when someone asks to switch it back on.

📄 Paper and padlocks

  • A tag on a board, with no proof the isolator stood at the right point.
  • One key in a group box, and a crew who can't tell who removed it.
  • Try-outs and trial runs that live in someone's memory.
  • Permits signed after the fact when the shutdown clock is running.
  • An audit trail you rebuild from clipboards after something goes wrong.

🔒 Smart LOTO

  • The isolator scans the point's QR before the lock goes on. Wrong point, no lock.
  • Every worker holds a personal lock tied to their face. De-isolation waits for the last one.
  • Trial runs need everyone out and the permit issuer's approval, then re-isolation is enforced.
  • The app refuses a step that isn't safe yet. Production pressure can't skip it.
  • Every scan, lock, face check and photo is timestamped the moment it happens.
How it works

Six proofs between live and safe.

From the permit arriving to the machine running again, each step leaves evidence the next person can check.

The app on the plant floor

Built for gloves, noise and no signal.

Android, iOS and a web console

Isolators and workers on phones, permit holders and permit issuers on tablets or desktops. One live record.

Keeps working in dead zones

Deep inside a mill or a switch room, the lock and the phone still talk over Bluetooth.

Evidence photos, stamped

Point, lock, status and time burned into every isolation and de-isolation photo.

09:265G ▮▮▮
Demo PlantKiln line 1
isolator@demoISOLATOR
GENERAL WORK PERMITKiln main drive · bearing change
DEMO-GWP-20417 · 5 isolation points
LOCKED ✓
Shackle closed, reported by the lock. Battery 92%.
PROGRESS
5 / 5 isolation points locked
KLN-MD ELECTRICALLOCKED
KLN-AUX ELECTRICALLOCKED
GG-AIR PNEUMATICLOCKED
WORKFLOW
Lockout in progress
Isolation verification
Assign workers
Work in progress
Face ID with liveness

A random head-turn challenge beats photos and replays. Contractors enrol on site, no login needed.

“Am I safe?” in one scan

Any worker scans a point and sees whether it's locked, by whom, and for which permit.

Two-way with your permit system

Permits flow in from your permit-to-work system; every isolation and release flows back.

Industries

Watch it run in your kind of plant.

Six interactive 3D simulations, each a real job with its own hazards. Scrub the timeline, orbit the plant, and see the app on every person's device.

In the field

Live on real permits, every working day.

Heavy-industry plants run Smart LOTO on live isolations, wired two-way into their permit-to-work systems. Permits arrive with their isolation points, and every lock and release goes straight back to your permit system from the field.

2-wayLive permit system integration: permits in, isolations back
Face IDContractors checked in and out by face, no logins to manage
QRA tag on every isolation point, scanned before any lock
Every rolePermit Holders, permit issuers, isolators and workers on one system
  1. IntegrationTwo-way with your permit system

    Real work orders flow into Smart LOTO; isolations are confirmed back to the permit system from the field.

  2. IdentityFace ID with liveness

    Every worker and contractor checked in and out against the isolation they work under.

  3. Complex jobsShared locks and trials

    SIMOPS shared isolations, emergency-unlock governance and the machine-trial cycle, all in daily use.

  4. Built with the fieldShaped by operators

    Features shipped from what the plant floor needed next, without disrupting live operations.

Security & compliance

Built to stand up to an audit, an inquiry and your IT team.

OSHA 1910.147 aligned

Energy-control steps, personal locks, try-out and release order mapped to the standard.

Each organisation walled off

Every organisation's data is kept separate on the server, with role-based access for every action.

Evidence can't be edited

Isolation photos and audit entries are written once. Nobody can alter or delete them later.

Unsafe steps refused

Interlocks run on the server, not just the phone. A permit can't close while anyone is still on it.

Your plant, locked out properly

See your own isolation procedure running in Smart LOTO.

Send us one permit and its isolation points. We'll set it up and walk your team through it, point by point, on real hardware.